Distributed Weather Data Collection System: Feasibility Report

Michael Van Wickle

August 1st, 2016

Table of Contents

  • Executive Summary
  • Preliminary Requirements Analysis
    • A. Application Overview
      • 1. Objectives
  • Technical Feasibility
    • A. Overview
  • Success Criteria
  • Design
  • Cost
  • Report
  • Risk Analysis
  • Conclusion
    • A. Feasibility
    • B. Feasibility Conditions
    • C. Summary

Executive Summary

The system outlined in this study is a distributed method for the collection of weather-related data. The system consists of a network of micro-controllers with attached sensors to measure temperature and pressure. Associated with this system is a web application for the viewing and acquisition of collected data. The distributed nature of the system allows for a more granular view of weather data, allowing for better reporting and prediction of weather patterns. In addition, this system will attempt to be as open as possible as to effect the best possible analysis.

Based on preliminary research, this project is feasible.

Preliminary requirements analysis

The primary functionality provided is a system that collects weather data, specifically temperature and pressure, in a highly distributed manner. Micro-controllers will host the sensors that directly collect data; they will also contain networking functionality in order to send data to a centralized database. The data will be exposed to the public via a web application. Features provided by the web application include direct download of the data and visualizations based on the data.

Feasibility

This project has two broad components[i.n.], the sensor and the web applications. The sensor portion is composed of a micro-controller and multiple sensors. The micro-controller will also have some form of network connection and possibly some form of rudimentary data filtering mechanism. Network connectivity will be in the form of an ad-hoc network between all of the devices, with certain devices used as "exit nodes" which connect to the internet at large in order to upload to a central database and, by extension, the web application. Sensors to be included are for temperature (thermometer) and pressure (barometer). Data sent to the central database will be a timestamp, location data, and the data collected by the sensors. The web application is build[i.n.] on top of a database containing the data sent from the sensors. The two main features for the web application are data download and visualization creation.

Success criteria

Sensors

  • Micro-Controller: The base platform, essentially a small computer which provides power to all of the other components. It also may contain some basic data filtering software in order to prune noise from the collected data.
  • Network Connectivity: The sensors will be connected via an ad-hoc network model. In this model, most units will only be connected to other units. Pre-programed into each unit, will be the routing data which provides a path to a unit that has connection to the actual internet (an "exit node"). Thus, each unit will push its data towards the unit that is "closer" to an "exit node" until the data is pushed to the database.
  • Temperature Sensor: A basic thermometer, this will collect the temperature at an appropriate precision.
  • Pressure Sensor: A barometer, this will collect pressure data at an appropriate precision.
  • Location Data: In order for the system to work, each sensor must have its own location. This will be programmed in upon installation, likely in the form of a latitude, longitude pair.
Web Application
  • User Interface: The user interface should provide easy and intuitive access to all of the functionality provided. The interface should be optimized for use on desktop computers of all screen sizes. It also should have at least the basic ability to be used on mobile devices.
  • Data Download: Data download is the ability to pull ranges of data and possibly all data from the database. Also provided is the ability to download data in many different formats.
  • Visualizations: This feature will create various forms of visual representations of the data. This includes map overlays of the data, animations of the data, and various charts that show changes in the data over time.

Design

 Potential Micro-Controller
                (Arduino Uno)
Potential Micro-Controller (Arduino Uno)
Potential Micro-Controller (Arduino Uno)

Cost Estimates

This[i.n.] sensors could use many commercial off the shelf products. For the micro-controller, an Arduino based chip could be used. These kinds of controllers are widely available and have the additional advantage of being open-source. The cheapest appropriate model would be rather expensive at fifteen to twenty dollars, but that price could go down as the boards are bought in bulk. Sensors provided by the Arduino project could also be used. A temperature sensor costs around one dollar and fifty cents and a pressure sensor costs around five dollars. Both of these prices, as with the chip, could go down with bulk purchases. The most expensive piece of equipment to buy would be network connectivity module, which would likely cost more than twenty dollars. Assuming a cost of twenty dollars for both the chip and the network module, this adds up to an overall cost of about forty seven dollars per unit. This price seems quite restrictive on the surface, but the price could decrease with bulk pricing and/or the possible development of specialized micro-controllers.

The costs for the web application consist of payment to developers and hosting fees.

Report

  • 2017-01-01: Complete research into technical feasibility. Begin research into implementation details, i.e., actual components, financial details.
  • 2017-02-01: Complete implementation details. Begin creation of proof of concept.
  • 2017-03-01: Show proof of concept to potential investors and/or public officials.
  • 2016-04-01: Obtain funding. Begin actual implementation.
  • Risk Analysis

    Potential risks to this system include, but are not limited to, loss of funding and public disinterest in the project[i.n.]. These two risks are intertwined as each can lead to the other. Mitigating the risk of public disinterest could be achieved by hiring a public relations firm to create and/or maintain enthusiasm for a distributed weather system.

    Causes of funding loss for the project depend on the actual source of said funding.[i.n.] If most of the financing for the project is public, disinterest in the project is a likely cause, which was discussed in the previous paragraph. If funding is generally private, the causes are numerous and mitigation strategies more nebulous and possibly less effective. Again, a downturn in public opinion could reduce funding. The most general and likely cause of private funding loss is the fiscal state of the company providing funding. Once a downturn of the funding company has started, it is out of the hands of the executors of this project. The only real way to reduce this risk is to choose a funding company that stable for the foreseeable future.

    Conclusion

    Based on preliminary research, this project seems to be technologically feasible. From a practical perspective, these systems should be designed to be deployed in small segments, e.g., a neighborhood, as deploying in a entire city at one time would be fiscally and technically challenging.[i.n.]

    The main hurdle to any actual implementation of this project is funding. A significant amount of the funding to this project would likely need to be public. The need for public funding necessitates a campaign in order to drum up general support for this project.

    This is a project that would provide more granular and open granular weather data. The described implementation is made of commercially available, common parts. This system is quite feasible in the current environment.

    Peer review

    For Project 2, Michael wrote a feasibility report for a distributed weather data collection system which he believes is feasible. This system consists of a network to measure temperature and pressure and a web application to collect and view the data. ere.

    A feasibility report would be written in response to the question of a project or idea being feasible, and these reports include logical, factual data to support their claims. Michael’s writing for Project 2 follows this genre, as shown by his explanation of his project, his supporting evidence, and his position that it is feasible. As an expert in this genre, Michael’s sentences are appropriate. They communicate facts of his weather data collection system in a direct manner, and they do not include emotional pleas to support his belief that his project is feasible. His word choices are appropriate as they deal with many technical aspects of his project. For example, he details system components like micro-controllers, data visualization, and exit nodes. One major missing piece is a section for risk analysis. This is important to a feasibility report so that any major concerns over the project can be addressed. This helps answer if a project is feasible despite possible complications. Another element that could be included is a design. Some type of diagram could show how the sensor network could communicate with a central database and eventually a web application. Also a report section could be added to detail how progress would be reported on the project.

    Overall, the structure of Michael’s feasibility report conforms to the schema that our group created. He mentioned in his peer review memo that he was concerned that he used too many idioms. However, I did not see this, and I believe that his language and sentences were appropriate. Michael also had questions about the distinction between the preliminary requirements and success criteria section. I think that his success criteria section was effective in showing the different components of his project. However, I think that to differentiate the preliminary requirements from it, he could add information for types rls (rules and regulations encountered) and synergy (how his project interacts with any existing systems). Lastly I think that he could add the missing elements referenced earlier in order to make his feasibility report more complete.

    Instructor Note

    This is a great example of a feasibility report--it is well thought out and well researched. I am fascinated by the potential for this project, as well. Your success criteria section, in particular, stands out as especially thorough and well done. Throughout you maintain an appropriate tone for the genre. Pay attention to the minor questions and corrections I added in the in-text comments. On the whole, very well done!